How long does it take to install Submer’s equipment?

Submer pods can be pre-integrated off site, which saves time during the installation phase. Provided all the interconnecting services are in place, setting up the equipment – mechanical, electrical and monitoring -, and filling it up with the immersion fluids takes 2 to 6 hours, depending on the number of pods.

How long does it take to install Submer’s equipment?

Written by

Alexandra MacDiarmid

Published on

June 25, 2024
Back